Proposition A - East/West Roads (Keller Springs Road/Airport Parkway)
The sale of $22,300,000 in general obligation bonds for street improvements.
Reconstruction of Keller Springs Road from Dallas North Tollway to Addison Road
Estimated Cost: $12,900,000
- Keller Springs Road was built in 1979
- Asset Management Risk Score based on Addison’s Asset Management Plan: Red
- Current Pavement Condition Index based on Addison’s Pavement Condition Index: Very Poor
- Replace asphalt roadway with concrete
- Upsize existing utilities
- Install Master Transportation Plan elements
- Median (none currently exists)
- 6-foot sidewalks (current sidewalk is four to five feet)
- 5-foot parkway buffer between the street and the sidewalk (there is currently no buffer between the street and the sidewalk)
- Acquire right-of-way for medians, sidewalks, and landscaping
- Replace traffic signal
Reconstruction of Airport Parkway from Dallas North Tollway to Addison Road
Estimated Cost: $9,400,000
- Airport Parkway was built in 1978
- Asset Management Risk Score based on Addison’s Asset Management Plan: Red
- Current Pavement Condition Index based on Addison's Pavement Condition Index: Very Poor
- Replace asphalt roadway with concrete roadway
- Upsize existing utilities
- Install Master Transportation Plan elements
- 12-foot turn lane (currently there are no turn lanes)
- 8-foot parallel parking (no on-street parking currently exists)
- 8-foot sidewalks with 6-foot parkway buffer with tree wells (currently sidewalks are inconsistent through the corridor)
- Acquire right-of-way for medians, sidewalks, and landscaping
- Replace traffic signal
Project scope, locations, and cost estimates are based on information currently available and are, therefore, subject to change on the basis of new and refined information up to the time of completion.